Automated Coating Solution for OPPLE Group
This overseas customer faced the dual challenge of a shortage of skilled technical personnel and rising raw material costs, creating an urgent need for a coating system that was easy to operate and capable of significantly reducing coating waste.
System Configuration
- Milepost controller
- AG09 automatic spray gun
- CoatPilot® coating management system
Project Results
-
Faster Overseas Production Launch
The project helped the customer save approximately RMB 350,000 (about USD 50,000) in investment and shortened the production line setup cycle.
-
Reliable Lifecycle Support
Although the project was located overseas, Haztek’s stable hardware, including the PPH40 powder pump, helped keep operating and maintenance costs at a very low level of RMB 2,000 per unit per year.
-
Greener Production Performance
Coating material waste was reduced by 10%, while production efficiency increased by 25%, supporting the environmental upgrade trend in Southeast Asian factories.



